Sikkens CETOL WF 9810-04-25 Brush Semi-Matt Wood Stain
Sikkens CETOL® WF 910 brushable semi-matt stain for exterior doors and windows
Sikkens Wood Coatings are the industrial division of Akzo Nobel and are renowned for their expertise in joinery coatings. Sikkens CETOL® WF 910 is a Brushable 1K Waterborne Acrylic, Semi-matt, Tranlucent Stain that can be used as a mid or topcoat on both exterior and interior stable timber components. It can also be used for maintenance of windows and doors previously coated in Sikkens CETOLl® WF 952 or Sikkens CETOL® WF 950.
Features
- Suitable for softwood and hardwood previously treated in Sikkens products
- Apply by Brush or Roller
- Available in the Sikkens Joinery Colour Classic Shades
- Good weather resistance
- Good UV protection
- Tested according to DIN EN 71 Part 3 "Safety of toys"
- Ready to use system for use on external and internal wood
Technical Information
Brand | Sikkens Wood Coatings |
---|---|
Coverage | 10m2 per litre |
Application | Brush |
Drying Time | Touch dry in 30 minutes, dry to handle in 4–6 hours @ 23°C |
Coats | 2 coats recommended |
Cleanup | Clean directly after use with water or washing up liquid or with Sikkens ST 830 |
Storage | 2 Years if can kept dry and firmly shut |
VOC | 50g/l |
Ingredients | Pure Acrylic |
Documentation
Product Information (348KB)
Safety Data Sheet (96KB)
Safety
Here at AllFinishes we take health and safety seriously and recommend you use the correct protection for the job. Disregarding safety equipment can be damaging and result in long term health conditions. Please check out our Moldex range for high quality respirators and hearing protection.
Preparation
Perfect sanding is a must for a clean and attractive surface finish.
The wood moisture content for the application of Sikkens coating systems should be between 12–15%.
Imperfect, loose coating must be completely removed. Intact coating should be completely sanded. Raw wood must be impregnated where necessary using Sikkens CETOL® WV 885 BPD.
Application
Always consult the technical data sheet before use. Before use, read the technical data and product information. Even when working with low emission products one should take care of the customary protection measures.
Applying the product too generously and with insufficient ventilation will lead to delays in drying.
Primer coat of Sikkens CETOL® WP 511
Mid coat of Sikkens CETOL® WF 910
Top coat of Sikkens CETOL® WF 910
The choice and use of the coating system, especially the colour shade, should also be taken into account. Darker shades can increase the surface temperature (up to 80°C)
Allow to dry for approximately 4–6 hours with good ventilation in between coats. Lower temperatures and/or higher air humidity can increase the drying time.
After 2–3 weeks, the surface is completely and thoroughly hardened.
Aftercare
Wood surfaces treated with Sikkens CETOL® WF 910 are easy to maintain.
Remove coarse dirt with a stiff bristle nylon bristle brush. Clean with a mild detergent solution and rinse well with clean water. Allow to dry. A proprietary fungicidal wash may be used where appropriate.